OEHLANDT ENERGY OY

REFERENCES

2024

Valmet (VKJ), Vilnius, Lithuania

Site supervision for CHP plant supervisory controls.

2023

Afry (Adven), Seinäjoki Finland

Start-up of the steam-levelling system.
Site supervision.

2023

Afry (IP, Flint River), USA

Start-up of the steam-levelling system.
Site supervision.

2023
&
2024

Stora Enso, Oulu Finland

Designing an new steam-levelling control system for the Oulu mill.

2023

Mercer Stendal, Germany

Optimizing work on several pulp mill areas at site.

2023

Afry Husum (Metsäboard), Sweden

Start-up of the new steam-levelling system.
Site supervision.

2022

Afry (Irving), Canada

Steam net overall control diagram for simulation.

2022

Afry (IP, Flint River), USA

Assistance on steam balancing system.

2022

Afry (Hamburger), Hungary

Steam net overall control diagram for simulation.

2022

Afry (IP Riverdale), Alabama, USA

Steam net analysing/optimising at site.

2022

Afry Husum (Metsäboard), Sweden

Assistance on steam balancing system.

2022

Mercer Stendal, Germany

Optimizing work on several pulp mill areas.

2021

Afry Lucite, Cassel, UK

Assistance on steam balancing system.

2021

Steinmüller Babcock Environment, Lithuania

Start-up assistance (testing/tuning/training ) for CHP plant supervisory controls.

2021

Mercer Stendal, Germany

Optimizing work on several pulp mill areas.

2020

SCA Obbola Sweden

Assistance on steam balancing system.

2020

Mercer Stendal, Germany

Optimizing work on several pulp mill areas.

2020

Steinmüller Babcock Environment, Lithuania

Design and optimising the supervisory control for a CHP plant.
(1 waste boiler, 2 bio boiler, 2 steam turbines and district heat.)

2019

Mercer Stendal, Germany

Automatization (Start, Stop and Produktion) of lime kiln.

2019

Kilpilahti Power Plant Ltd, Finland

Supervision of quarantee tests 6x 200 m3/h ion exchange demineralisation plant.

2019

Pöyry Finland Oy, (Kotkan Energia Oy), Finland

Procurement and supervision of delivery for demineralisation plant 2x 5 kg/s RO+EDI+MB, flue gas treatment plant 9 kg/s chemical coagulation and 6 kg/s demineralisation plant, AC+ softening + RO.

2019

Mercer Stendal, Germany

Designing and optimising the bark boiler load control concept. This related to the totall plant demands.

2018

Pöyry Finland Oy, (Kotkan Energia Oy), Finland

Study for renovation of flue gas treatment plant,
demineralisation plant and condensate polishing.

2018

Mercer Stendal, Germany

Updating the existing steam-levelling control system for operation with a new control system for steam turbine 1.

2018

UPM Shotton, UK

Updating the existing steam-levelling control system for the new steam demand.

2018

Mercer Stendal, Germany

Optimizing pulp mill departments. (E.g. causticizing)

2017

UPM Shotton, UK

Analysing the steam net dynamic

2017

SCA Obbola, Sweden

Analysing and updating the steam-net to todays demands.

2016/7

Zellstoff Stendal, Germany

Optimizing pulp mill departments.

2016

Dolpin Energy Limited, Qatar

Steam net and boiler tuning and optimising to increase the reliability of the plant.

2015

Zellstoff Stendal, Germany

Optimizing pulp mill departments.

2014

Andritz Blackburn, UK

New biomass boiler tuning and optimizing on start-up.

2014

Zellstoff Stendal, Germany

Optimizing pulp mill departments
(evaporation, cooking, tall oil etc.)

2013

Zellstoff- und Papierfabrik Rosenthal GmbH, Blankenstein, Germany

Optimizing the steam levelling system for increased steam production.

2012

Andritz, Blackburn, UK

Assistance by steam controls for biomass power station.

2012

Zellstoff Stendal, Germany

Updating the existing steam-levelling control system for operation with a new steam turbine 2.
Site supervision.
Operator training.

2011
&
2012

Pöyry Ltd Thailand

Assistance on Gulf project (14 GT:s, 14 HRSG:s & 7 ST:s).

2011

UPM Caledonia, Scotland

Optimizing the biofuel boilers air controls.
Inspecting the functionality off all boiler/steam controls.

2011

IP Riverdale, Alabama, USA

Optimization of the steam-levelling system including boiler controls.
Site supervision.

2011

Porin Prosessivoima Oy, Pori , Finland

Assistance by turbine and steam levelling controls.
Site supervision.

2011

M-Real Oyj, Simpele, Finland

Study for the steam control structure of the plant. The study is based on the planned process steam demand changes.

2010

UPM Chapelle Darblay, France

Extending the 2005 build steam levelling control system by a condensing turbine.
Site supervision.

2010

UPM Caledonia, Scotland

Operator training.
Optimizing the plant to the actual demands .

2010

UPM KauVo, Finland

Optimization of the steam-levelling system.
Site supervision.

2010

Myllykoski, MD Albbruck, Germany

Optimization of the steam-levelling system.

2009

Umeå Energi, Dåva 2, Sweden

Tuning of the district heating system.
Tuning of the controllers of the biofuel boiler.
Operator training

2009

UPM Caledonia, Scotland

Optimization of the steam-levelling system.
Site supervision.

2008
&
2009

Porin Voima, Finland

Optimization of the steam-levelling system.
Site supervision.

2008

Domtar Marlboro Paper Mill, South Carolina

Optimization of the steam-levelling system.

2008

Korea District Heating Engineering Company (KDHEC), Korea

Engineering assistance by several CHP-plants.

2008
&
2009

UPM KauVo, Finland

Design of CHP-Plant steam-levelling system.

2007

SCA Obbola, Sweden

Optimization of the controllers of a new recovery boiler.
Optimization of the steam-levelling system.
Site supervision.

2007
&
2006

UPM Shotton, UK

Design of steam-levelling system.
Optimization of the CHP-Plant water-steam system.
Site supervision.
Customer training.

2007
&
2006

UPM Chapelle Darblay, France

Design of steam-levelling system.
Optimization of CHP-Plant water-steam system.
Site supervision.
Customer training.

2006

M-real Alizay, France

Optimization of the steam-levelling system
Site supervision

2005

UPM Changshu, China

Optimization of the steam-levelling system
Site supervision

2005

Veracel, Eunapolis, Brazil

Detail planning of steam-net leveling system at site
Optimization of the steam-levelling system
Site supervision

2004

Zellstoff Stendal, Germany

Operator training
Optimization of the steam-levelling system
Site supervision

2003

Kuopion Energia, Haapaniemi 1, Finland

Renovation of the automation system for boiler plant
Site supervision

2003

Sunila, Finland

Optimization of steam-levelling system.

2003

Stora Enso Langerbrugge, Belgium

Design of steam-levelling system at site
Site supervision
Optimization of steam-levelling system

2002

SCA Obbola, Sweden

Optimization of steam-levelling system
Site supervision

2002
&
2001

Frantschach Swiecie, Poland

Design of steam-levelling system at site
Site supervision
Optimization of steam-levelling system

2001

Fingrid Vanaja,Kilpilahti, Naantali & Tahkoluoto, Finland

Analysing and testing the function of Gas turbines

2001

Otor, France

Acceptance tests for the steam–levelling system

2001

Stora Enso Port Hawkesbury, Canada

Analysing the steam-net dynamics

2001

Chorzow CHP plant, Poland

Design of district heating control system

2001

AssiDomän Karlsborg, Sweden

Analysing the steam-net dynamics

2001

Södrä Värö, Sweden

Analysing the steam-net dynamics

2000

UPM-Kymmene, Jämsänkoski, Finland

Design of steam-levelling system

2000
&
1998

Zellstoff- und Papierfabrik Rosenthal GmbH, Blankenstein, Germany

Design of steam-levelling system
Optimization of the steam-levelling system
Site supervision
Customer training

1998

Metsä-Serla Oy, Kirkniemi, Finland

Optimization of the steam-levelling system
Site supervision

1997

Metsä-Serla Oy, Kirkniemi, Finland

Renovation of the automation system for a fluidized bed boiler plant
Site supervision

1997

National Power Supply Co. Ltd, Tha Toom, Thailand

Renovation of the automation system for a fluidized bed boiler plant
Design of steam-levelling system

1997
&
1996

Helsinki Energy Board, Vuosaari B, Finland

Engineering
Automation system training
Start-up assistance

1996
&
1994

Sava GmbH, Brunsbüttel, Germany

Waste incineration plant engineering
Site supervision

1994

Imatran Voima Oy, Inkoo, Finland

Renovating of NOx combustion
Site supervision

1993
&
1991

Imatran Voima Oy, Meripori, Finland

Engineering of automation system

1991
&
1990

Stanwell Energy Board, Australia

Automation engineering
Designind safety interlocks

1990

Cleanaway, Chester, England

Automation engineering
Site supervision

1990
&
1989

ENDESA, National Electricity Supply Co, Spain

Automation engineering

1989

Energy Board, Lyon, France

Automation engineering

1989
&
1988

Stellinger Moor, Hamburg, Germany

Waste incineration plant automation engineering
Site supervision

1988

Metsä-Serla Oy, Mänttä, Finland

Automation engineering
Start-up assistance

1988

Rovaniemi Energy Board, Rovaniemi, Finland

Designing of automation
Start-up assistance

1987

Vantaa Electricity Supply Co, Koivukylä, Finland

Designing of automation
Start-up assistance